Home Page
The Team
The Aircraft
Sponsors
Download
Gallery
Shop
Link
 
 

5-09-05
Panel instruments.
 

3-24-05
First rollout : slick design.
 

3-24-05
First rollout
 

3-24-05
First rollout
 

7-10-04
Kevin assembling tail wheel.
 

7-10-04
Son Taylor helping.
 

6-1-04
Instrument Panel with Blue Mountain Avionics and Garmin 430 is complete.
 

6-1-04
Flipped over to complete bodywork on bottom: note the flaps.
 

6-1-04
Flipped over to complete bodywork on bottom before final installation of systems.
 

3-1-04
The cowl and the spinner look like a sculpture. We love this aircraft!
 

3-1-04
The engine: Lycoming TI0-540-NXT
 

3-1-04
Fit engine mount.
 

9-22-03
...the shape of the SPEED!
 

9-22-03
...very low profile.
 

9-22-03
Fuselage fitted to wings: she scare!
 

9-22-03
Fuselage fitted to wings: very sexy design.
 

6-03-03
Yury Gaitan, composite expert.
 

6-03-03
Building the wings.
 

6-03-03
The cockpit hole and the instrument panel
 

6-03-03
The fuselage fitted with the rudder.